Friday, March 16, 2012

Roof framing

Today, we added labels to the beams in our library ceiling. We needed to calculate all of the loads in lbs/ft.

Beam diagrams









Not sure what to say. I'll just edit this later

Friday, March 2, 2012

This quarter in class, we have been renovating a library. we needed to put in rooms and everything that you would normally find in a library.              

The rendering of my library


Floor plan of ground floor

Floor plan of greenroof and 2nd floor

East elevation view

North elevation view

South elevation view (roof slope indicated here)

West elevation view
       For the most part, this was a fun project. I liked making the rooms and putting the objects on the floor. I did not like exporting the pictures, and i do not enjoy writing this now.

Friday, February 17, 2012

Keystone library 2nd floor

In class today, we put a floor on the 2nd story in our library. We could either use precast slabs or cast-in place for our floors.





I liked this activity because it was quick and wasn't hard to do. I chose the precast because it is cheaper, faster, and easier, unlike cast-in-place, which takes time, and time=money.

Wednesday, February 15, 2012

Structural efficiency activity

Today in class, we made an 8 inch tall structure out of playing cards of tape that was required to hold at least 5 lbs.
 
       Image of your structure
 
We were in second place for the weight, which was 7861 g. Our structural efficiency rating was 225.69, which was about average. In our preliminary tests, we just made sure it held about 2200 g. which is about five lbs. We didnt revise our design.To improve structural efficiency, we could have made the cards half circles for more support and used less tape for less mass.       

Thursday, February 9, 2012

Keystone library Roof

Today we made a greenroof on the 2nd floor. we also put a roof above the other half of the building. We had to put specific layers in the green roof, like grass, and dirt.


It was fun because the requirements were pretty loose, we could choose the thickness of some of the materials and design the upper roof.